Feasibility level project cost estimate - Devil Canyon dam and reservoir
Saved in:
Corporate Author(s): | , |
---|---|
Publisher: | Alaska Power Authority |
Report Numbers: | APA 1458 |
Edition: | Draft Report |
Online Access: | Link to Full Text |
institution |
ARLIS |
---|---|
collection |
Susitna Doc Finder |
recordtype |
index |
id |
dbtw2297 |
upc_str_mv |
dbtw2297 |
spelling |
2297 December 17, 2015 October 17, 2016 Feasibility level project cost estimate - Devil Canyon dam and reservoir Harza-Ebasco Susitna Joint Venture Alaska Power Authority Prepared for: Alaska Power Authority http://www.arlis.org/docs/vol2/hydropower/ Draft Report Alaska Power Authority April 1984 http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._1458.pdf APA 1458 APA 01458 |
title |
Feasibility level project cost estimate - Devil Canyon dam and reservoir |
spellingShingle |
Feasibility level project cost estimate - Devil Canyon dam and reservoir APA 1458 |
title_short |
Feasibility level project cost estimate - Devil Canyon dam and reservoir |
title_full |
Feasibility level project cost estimate - Devil Canyon dam and reservoir |
title_fullStr |
Feasibility level project cost estimate - Devil Canyon dam and reservoir |
title_full_unstemmed |
Feasibility level project cost estimate - Devil Canyon dam and reservoir |
title_auth |
Feasibility level project cost estimate - Devil Canyon dam and reservoir |
title_sort |
feasibility level project cost estimate - devil canyon dam and reservoir |
author_corporate |
Harza-Ebasco Susitna Joint Venture Alaska Power Authority |
author_facet |
Harza-Ebasco Susitna Joint Venture Alaska Power Authority |
callnumber-raw |
|
callnumber-search |
|
callnumber-first |
|
callnumber-subject |
|
reportnumber |
APA 1458 |
reporttype_facet |
SuHydro |
publisher |
Alaska Power Authority |
edition |
Draft Report |
url |
http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._1458.pdf |
publishDateDisplay |
April 1984 |
publishDate |
1984 |
_version_ |
1639460602894090240 |
score |
8.091525 |