North Slope gas feasibility study - Draft final report - Final cost related sections
Saved in:
Corporate Author: | |
---|---|
Report Numbers: | APA 99 |
Online Access: | Link to Full Text |
institution |
ARLIS |
---|---|
collection |
Susitna Doc Finder |
recordtype |
index |
id |
dbtw1113 |
upc_str_mv |
dbtw1113 |
spelling |
1113 December 17, 2015 October 17, 2016 North Slope gas feasibility study - Draft final report - Final cost related sections Ebasco Services, Inc. http://www.arlis.org/docs/vol2/hydropower/ February 7, 1983 http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._99.pdf APA 99 APA 00099 |
title |
North Slope gas feasibility study - Draft final report - Final cost related sections |
spellingShingle |
North Slope gas feasibility study - Draft final report - Final cost related sections APA 99 |
title_short |
North Slope gas feasibility study - Draft final report - Final cost related sections |
title_full |
North Slope gas feasibility study - Draft final report - Final cost related sections |
title_fullStr |
North Slope gas feasibility study - Draft final report - Final cost related sections |
title_full_unstemmed |
North Slope gas feasibility study - Draft final report - Final cost related sections |
title_auth |
North Slope gas feasibility study - Draft final report - Final cost related sections |
title_sort |
north slope gas feasibility study - draft final report - final cost related sections |
author_corporate |
Ebasco Services, Inc. |
author_facet |
Ebasco Services, Inc. |
callnumber-raw |
|
callnumber-search |
|
callnumber-first |
|
callnumber-subject |
|
reportnumber |
APA 99 |
reporttype_facet |
SuHydro |
url |
http://www.arlis.org/docs/vol2/hydropower/APA_DOC_no._99.pdf |
publishDateDisplay |
February 7, 1983 |
publishDate |
1983 |
_version_ |
1639460559771402240 |
score |
8.091525 |